Tolko – Meadow Lake, Saskatchewan, Canada

Screening Project

Apr. 2024 to Jan. 2025

Project Details

CMA is providing all the detailed engineering for a system of new screw conveyors at Tolko’s Meadow Lake OSB mill. These new screw conveyors will distribute strands at the outfeed of the secondary screening system in a manner that will maximize board strength all while minimizing resin usage during the blending process.

CMA is also providing the budget and schedule preparation for the project.